Co-op Engineering – Mechanical Engineering

Last modified: August 29, 2017
You are here:
  • KB Home
  • Co-op Engineering – Mechanical Engineering
Estimated reading time: 16 min
In this article

Co-op Engineering – Mechanical Engineering

[vc_toggle title=”2013 /2556″]

  1. A development of preventive maintenance
  2. A development of the installation procedures and monitoring
  3. A development of the installation procedures and monitoring 1
  4. CAD CAM on a CNC Machine for camshaft CENTRIFUGAL FLOW FAN
  5. CHLORINE SUPPLY SYSTEM IN MAHASAWAT MANUFACTURING WATER PLANT
  6. Combined cycle power plant ( GasTurbine )
  7. Cost Reduction By Sealer Gauge
  8. DESIGN AND INSTALL SUBMERSIBLE SEWAGE PUMPS
  9. Distributor of car roof
  10. ENERGY CONSERVATION IN AIR-CONDITIONING SYSTEMS
  11. Energy Management of Air condition system in Phyathai 3 Hospital
  12. Fire Alarm System Control
  13. Fire Protection System In Building
  14. Fire Pump System Fire safety in buildings
  15. Improvement of a set of the for oil can in the conveyor
  16. Industrial Duct System
  17. Industrial fire Suppression System
  18. INSTALLATION SYSTEM SUCKS POWDER PULSE JET INSTALLING PIPES POOL SALT SYSTEM
  19. MAINTENACE OF AHU OF AIR CONDITIONING SYSTEM
  20. MAINTENANCE CENTRIFUGAL PUMP MODEL VEFLO CMP200
  21. MAINTENANCE DUMBWAITER
  22. MAINTENANCE OF ELECTRICAL GENERATOR OF THE RESERVE POWER GENERATION SYSTEM
  23. MAINTENANCE OF RUBBER BELT CONVEYOR SYSTEM
  24. Maintenance of the Shaft by Using Shaft Spray
  25. Operating Principle and Maintenance of the Split Type Air Conditioning System
  26. Preventive Maintenance of Water Cooled Chiller
  27. Process improvement in plasma process department
  28. Repair and Check Globe Valve
  29. SANITARY PROBLEMS AND SOLUTIONS
  30. sanitation systems in high-rise buildings at Supalai Vista
  31. STUDY OF INSTALLATION OF INDOOR PLUMBING WATER AND SEWAGE
  32. Surface preparation before painting
  33. Testing and the use of grain storage insert
  34. THE CASE STUDY OF INSTALLATION PROBLEM OF AIR DUCT SYSTEM IN THE BUILDING
  35. The Installation of Fire Suppression Systems in the Building
  36. The Maintenance of Air Conditioning in Building
  37. THE MAINTENANCE OF PIPELINE FOR MARINE
  38. THE MOLDS PLATE SECONDARY MIRROR TOYOTA VIOS
  39. THE PREVENTIVE MANTENANCE OF FCU AND AHU SET IN CHILLER SYSTEM
  40. Transfer And Booster Pump Systems
  41. Using a CNC lathe to produce the rivet Using a milling machine CNC to produce components of swing door
  42. Water management systems
  43. WET PIPE SYSTEM

[/vc_toggle][fruitful_sep]
[vc_toggle title=”2014 /2557″]

  1. Improvermant of water supply system to reduce materials
  2. Measurement of resin Performance for ion exchange in soft water system
  3. Reduce of cost production with Auto CAD program instead of writing by hand
  4. Cooling load calculation for store Swensens branch Central Rama-2
  5. Design cooling water pipes support of the air conditioning system in power station building Siriraj Hospital
  6. Design of lock shaft folding machines case study of Siam Corner Coral Engineering Limited.
  7.  Project air conditioning system improvement for reception department in Esso Tower-G-floor
  8. The production process of motorcycle brake line
  9. Maintenance Rubber Tyred Gantry Crane
  10. Maintenance 40t bromma boom gantry crane
  11. INSTALLATION OF EBARA PUMP AND PUMPING SYSTEMS
  12. Check for leaks piping work by hydro-static test
  13. Analysis and comparison of technical information air inlet filter for gas turbine
  14. A case study of the system of the downdraft gasifier
  15. INCREASING PRODUCTIVITY STEEL ROOF
  16. Design Hydraulic Presses for bending the shaft
  17. Design and Development of Aluminum Foil Flexible Clamp Handle in Ventilation System
  18. Improvement of Laser Cutting Machine Roller Clutch Trailer System
  19. Saving Energy by Using Inverter Air Conditioner Replace Normal Air Conditioner at Saranrom Palace
  20. Adapt Hydraulic jack 20 Ton for Bending shaft 30-45 mm.
  21. Equipment Design Unstick of Valve cylinder Head Gas NGV Case Study of Takuni (Thailand) Limited
  22. Adapt Hydraulic Jack 2 Ton for bending shaft 10 – 25 mm
  23. The Innovative Design for Waste Pipes Installation of Lumpini Place Rama 4
  24. Structure Design and Development of Lift for Oxygen Pump In Wastewater System
  25. Structure Design for Cover Plate Maintenance in Wastewater Systems
  26. Automatic Laser Cutting Machine Control Based on Safety Sensor System
  27. The Innovative Design For Soil Pipes Installation of Lumpini Place Rama 4
  28. Prototype for Steel Compression with Pneumatic System
  29. Reducing workload amd time in syudying a machine manual by translating it into Thai language

[/vc_toggle][fruitful_sep]
[vc_toggle title=”2015 /2558″]
[fruitful_tabs type=”accordion” width=”100%” fit=”false” closed=”false”]
[fruitful_tab title=”* Increasing Productivity Steel Roof “]

Abstract

Company takuni Thailand co., Ltd., is a leading engineering and distribution of products, liquid gas, gas cars, including as products various and installation of equipment NGV and LPG in cars for many years and the company still have an important role in the industry in small-large. Currently, LPG and NGV as alternative energy use in cars are also more popular. Due able save money on fuel instantly in prices of install, tolerable compared to other alternative fuels. Install of gas to with private car. , pickup truck, bus, 10 wheel truck including car, trailer or vehicle various which Install of gas for a long time may make gas tank valve head NGV defective which unstick valve header tank NGV each occasion the make unstick valve header tank NGV is quite fairly long because no devices help to unstick and in Sahakij project, organizer do study design equipment unstick valve header tank NGV by using program for design equipment unstick valve header tank NGV according standard real Purposes to meet industry standards and equipment design unstick valve header tank NGV reduce the time in unstick valve header tank NGV. This also ease of quick to perform the task and security of unstick valve header tank. The study found that unstick valve header tank NGV 70 liters and 100 liters. Use labor 2 people and use duration of unstick valve header tank NGV the averaged 17.8 minutes / gas NGV. Compared to unstick valve header tank NGV. Through normal methods by use labor 3 people and use duration averaged 33.6 minutes / gas NGV. Accounted for percentage decrease of 23 % and reduce number person from 3 person. Remaining only 2 person fallen 1 person per unstick valve header tank NGV 1 tank

Keyword: Unstick valve header tank NGV, Security

[/fruitful_tab]

[fruitful_tab title=”*Design and Development of Aluminum Foil Flexible Clamp Handle in Ventilation System”]

Abstract

The main parts of ventilation system are exhaust air fan and supply air duct. The supply air duct can be divided into two parts. The first part is the main air duct which is unbendable. The second part is flexible duct which is bendable and flexible used for connecting the main air duct to the ventilator. Inside the Diplomat Sathorn Condominium, aluminum foil flexible is used in the ventilation system. After installing the main air duct and aluminum foil soft pipe, the ceiling will be closed and drilled to make a hole for the aluminum foil flexible able to come through. Then, a wooden cardboard will be installed for the aluminum foil flexible to be put along inside and connected to the ventilator at the bottom of the wooden cardboard. The problem which happens often is that the wooden cardboard is installed before bringing the aluminum foil flexible out of the ceiling. Thus, it is impossible to get the aluminum foil flexible from the ceiling by using hand because the distance is too far. In this project, we designed and developed of aluminum foil flexible clamp handle to facilitate in getting the aluminum foil flexible from the ceiling down to the connecting point with the ventilator. The result found in this project is that the tool can extend the distance in reaching the aluminum foil flexible and save time in picking the aluminum foil soft pipe. Previously, it took about 30 minutes to finish this task in each room. By using this tool, it takes only 5 minutes per room.

Keyword: Aluminum foil flexible, ventilation system
[/fruitful_tab]

[fruitful_tab title=” Design and Development of Aluminum Foil Flexible Clamp Handle in Ventilation System “]

Abstract

A wrought steel was developed from a forgery. In the past, a forgery could be seen in black smith. Firstly, its process changed from stretching with sintering to wrought and compressed processes. The common problem that is found in the industry is distorted shafts that steel can not be grind. Therefore there have to be a machine that bending the shafts first before grinding. The organization has the hydraulic compressor that is used as a large scale, so the machine is hard to control due to the heavy weight of material which is equal to 30 tons. Also, the distant of the machine is too far, and there is a difficulty of machine movement which causes delay in the process. In this project, there will be the solution to solve the mentioned problem by modifying the compressor to be more efficient. The modification is from 2 tons and 20 tons of carjacks which can be moved and grinding steel effectively. The results are beneficial for the organization. Not only it can save time, but it also can be maintenance easily. Besides, the modification is safer to use than the old one.

Keywords : hydraulic compressor , steel bending pedestal , steel bending structure

[/fruitful_tab]

[fruitful_tab title=”Improvement of Laser Cutting Machine Roller Clutch Trailer System”]

Abstract

The laser cutting machine is important with parts and assembles automotive manufacturing process for steel cutting of identify part. There is important component that is the roller clutch trailer system which helps to feed steel into the laser cutting machine. The roller clutch trailer system is lifted high up for slid conveniently when steel plate into laser cutting machine and pressed down when the steel plate is position appropriate of laser cutting. Nowaday the roller clutch trailer system of the laser cutting machine of this company was designed by automatic control. When the laser cutting machine has been using long time so the performance of the roller clutch trailer automatic control system damaged which affect to time and cost increase of maintenance So, this project the roller clutch trailer is improved by the control valve system instead automatic control which affect to time and cost reduce of process .

Key words : Roller Clutch Trailer /Laser Cutting Machine/Control Valve

[/fruitful_tab]

[fruitful_tab title=”Saving Energy by Using Inverter Air Conditioner Replace Normal Air Conditioner at Saranrom Palace “]

Abstract

Prom Techno Service Co., Ltd. is a company certified by ISO. This operates in equipment maintenance services, monitors the use of the building such as utility systems, wastewater treatment systems, plumbing systems, electrical systems, air conditioning and ventilation systems, fire systems and construction of all types. The team of engineers and specialists have managed from planning, maintenance, inspection, repair, consulting and result analysis along with proposed solutions, including the revision of the machine. The company took cooperative students to study working system at Saranrom Palace in the sample of air conditioning and ventilation systems, fire systems, sanitary systems and electrical systems. Training Cooperative Education, the learner has found major problems in air conditioning systems. The air conditioning system in the type of normal split part wasted too much energy. This influenced the learner to represent the methodology of replacement on normal split part air conditioner in the building to inverter air conditioner (VRF), which is air conditioning systems splitting type with many cooling coils connected with single heated coil. Also compare electricity cost between the usage of air conditioners (normal split part) and inverter air conditioners (VRF) to find payback period. The result came out that the energy usage of inverter air conditioners (VRF) was saver than air conditioners (normal split type). This could save up to 329,472 baht / year, with a payback period of 1.51 years.

Keyword : Saving Energy, Inverter Air Conditioner, Normal Air Conditioner, Saranrom Palace

[/fruitful_tab]

[fruitful_tab title=” Adapt Hydraulic jack 20 Ton for Bending shaft 30-45 mm. Case Study of J.J. Grinding Company Limited”]

Abstract

The bending iron or privatization to steel in antiquity coming from bash such as sword bashing , knife, machetes, hoes, axes, spears, etc. then change are steel vise and bake. Nowadays change it is bending machine and machines press which made more convenient. However, the industrial factory found problem is bent steel of can’t iron cutting or privatization to steel. Must curling steel as standard. And bending machine to steel of industrial factory too large. Delays and wasted no time in bending work and weight control in press difficult. Due to compression forces of bending machine with Size Up to 30 tons and in Cooperative Education project, organizer to applying of car jack with Size 20 tons. To assist in bending shaft of size 30-45 mm. By using car jack in to pressing shaft.The steel shaft with standard for cutting. From bringing car jack of apply in bending the shaft and incur benefit to industrial factory is extremely. And save time in use andcan movable comfort. The safety of car jack more than bending machines to traditionaland maintenance – friendly than press machine.

Keywords:the bending iron,hydraulic jack 20 ton , iron deformation

[/fruitful_tab]

[fruitful_tab title=” Equipment Design Unstick of Valve cylinder Head Gas NGV Case Study of Takuni (Thailand) Limited “]

Abstract

Company takuni Thailand co., Ltd., is a leading engineering and distribution of products, liquid gas, gas cars, including as products various and installation of equipment NGV and LPG in cars for many years and the company still have an important role in the industry in small-large. Currently, LPG and NGV as alternative energy use in cars are also more popular. Due able save money on fuel instantly in prices of install, tolerable compared to other alternative fuels. Install of gas to with private car. , pickup truck, bus, 10 wheel truck including car, trailer or vehicle various which Install of gas for a long time may make gas tank valve head NGV defective which unstick valve header tank NGV each occasion the make unstick valve header tank NGV is quite fairly long because no devices help to unstick and in Sahakij project, organizer do study design equipment unstick valve header tank NGV by using program for design equipment unstick valve header tank NGV according standard real Purposes to meet industry standards and equipment design unstick valve header tank NGV reduce the time in unstick valve header tank NGV. This also ease of quick to perform the task and security of unstick valve header tank. The study found that unstick valve header tank NGV 70 liters and 100 liters. Use labor 2 people and use duration of unstick valve header tank NGV the averaged 17.8 minutes / gas NGV. Compared to unstick valve header tank NGV. Through normal methods by use labor 3 people and use duration averaged 33.6 minutes / gas NGV. Accounted for percentage decrease of 23 % and reduce number person from 3 person. Remaining only 2 person fallen 1 person per unstick valve header tank NGV 1 tank

Keyword: Unstick valve header tank NGV, Security

[/fruitful_tab]

[fruitful_tab title=”Adapt Hydraulic Jack 2 Ton for bending shaft 10 – 25 mm “]

Abstract

The bending iron or privatization to steel in antiquity coming from bash such as sword bashing , knife, machetes, hoes, axes, spears, etc. then change are steel vise and bake. Nowadays change it is bending machine and machines press which made more convenient. However, the industrial factory found problem is bent steel of can’t iron cutting or privatization to steel. Must curling steel as standard. And bending machine to steel of industrial factory too large. Delays and wasted no time in bending work and weight control in press difficult. Due to compression forces of bending machine with Size Up to 30 tons and in Cooperative Education project, organizer to applying of car jack with Size 2 tons. To assist in bending shaft of size 10-25 mm. By using car jack in to pressing shaft.The steel shaft with standard for cutting. From bringing car jack of apply in bending the shaft and incur benefit to industrial factory is extremely. And save time in use and can movable comfort. The safety of car jack more than bending machines to traditionaland maintenance – friendlythan press machine.

Keywords:The bending iron, hydraulicjack 2 ton , iron deformation

[/fruitful_tab]

[fruitful_tab title=” The Innovative Design for Waste Pipes Installation of Lumpini Place Rama 4″]

Abstract

Currently, real estate construction business is growing tremendously especially in Bangkok and vicinity areas. This is because these areas are economics center with high number of population density. Many manufacturing companies of condominium and high buildings are competing in residence construction business. There are many components in the construction of a high building such as sanitary system, cold water system, electrical system, building structure, of which a lot of time and money are required for installation. To improve this, an innovation has been invented to reduce cost and time in building construction focusing on sanitary system. A new method was invented for connecting west water pipe of sanitary wares for the benefits of related companies and organizations. This west water pipe connecting innovation can reduce many steps in installing west water pipe system and accelerate the process. The west water pipe installation becomes more accurate than using former method as the number of damaged pipes or consumable products caused by installation faults of technician are reduced. The consumable materials cost reduce from 8% to 3%. The installation time is also shortened from 2.40 hours to 2 hours. By using this west water pipe installation innovation, the company can save cost for 12.76% in building room T01 for 10 rooms in 8 floors. This innovation can be applied for pipe system of other sanitary works.

Keyword: innovation, west water pipe installation design, Lumpini Tower Rama 4

[/fruitful_tab]

[fruitful_tab title=”Structure Design and Development of Lift for Oxygen Pump In Wastewater System”]

Abstract

The main components of wastewater treatment are a wastewater treatment plant and an aerator pump. They are divided into two parts, a grease trap and a wastewater collection well. Checking and repairing these parts are time consuming. Problems can occur quickly, so checking and performing maintenance on the aeration pump must be done frequently. Checking is difficult because it takes a strong person to pull the pump and fill up the air. For this project i created a series of air lift pumps taken by using a winch and hanging reel, making it easier to do work. The project was to design and develop a series of air life pumps for wastewater treatment, to facilitate lifting of the aerator pump for wastewater treatment rise checks. The project resulted in a reduction in work time, reducing the pump lift time form 20 minutes to only 5 minutes. It was a success and will make work much easier in the future.

Keywords : Aerator pump,Wastewater Treatment

[/fruitful_tab]

[fruitful_tab title=”Structure Design for Cover Plate Maintenance in Wastewater Systems “]

Abstract

The project aims to test the capability and facilitate in opening and closing of cover plate in wastewater systems. Thus, it will be easier to check water condition and inspect water pump in the condominium. At present, there had been a steady increase in number of residents in the condominium. The water is an essential part of our life, when we consume the water supply, our wastewater is discharged through the drain to wastewater treatment tank of the condominium. Here, it will undergo biological treatment of wastewater, monitor and disinfect in order to remove pollutants in wastewater. Thus, water quality will be improved and lessen the adverse effect to waterways and the environment prior to being discharged into public sewers for the further treatment. This project has designed and developed The structure of cover plate maintenance in wastewater systems The result show that it’s save time 15 minutes reduce work force, and increase working safety. The system is functioned by using the installed hooks and lifers to hook with both sides of manhole or drain cover and pries it open instantly.

[/fruitful_tab]

[fruitful_tab title=” Automatic Laser Cutting Machine Control Based on Safety Sensor System “]

Abstract

A Laser cutting machine is designed for steel cutting with laser that high pierce beams. The laser cutting machine is required safety sensors for automatic shutdown in emergency case for the operated user protection. The conventional laser cutting machine composed of two wire lines. It damaged owing to use a long time. So, in this cooperative project is improved the sensor safety system up to date with safety. The design system is detected to look like a curtain. It is affected in better performance to be more comfortable and secure than the original system.

Keyword : safety/Laser lighting/sensor

[/fruitful_tab]

[fruitful_tab title=”The Innovative Design For Soil Pipes Installation of Lumpini Place Rama 4″]

Abstract

Currently, real estate construction business is growing tremendously especially in Bangkok and vicinity areas. This is because these areas are economics center with high number of population density. Many manufacturing companies of condominium and high buildings are competing in residence construction business. There are many components in the construction of a high building such as sanitary system, cold water system, electrical system, building structure, of which a lot of time and money are required for installation. To improve this, an innovation has been invented to reduce cost and time in building construction focusing on sanitary system. A new method was invented for connecting soil water pipe of sanitary wares for the benefits of related companies and organizations. This soil water pipe connecting innovation can reduce many steps in installing soil water pipe system and accelerate the process. The soil water pipe installation becomes more accurate than using former method as the number of damaged pipes or consumable products caused by installation faults of technician are reduced. The consumable materials cost reduce from 8% to 3%. The installation time is also shortened from 2.40 hours to 2 hours. By using this soil water pipe installation innovation, the company can save cost for 13% in building room T01 for 10 rooms in 8 floors. This innovation can be applied for pipe system of other sanitary works.

Keyword: innovation, soil water pipe installation design, Lumpini Tower Rama 4

[/fruitful_tab]

[fruitful_tab title=”Prototype for Steel Compression with Pneumatic System”]

Abstract

The beam is an essential component of the design and manufacture process of crane. The function is to be clash the force from the moving objects/parts. Producing of a beam crane is required for both the quality and enduring strength. In the producing process of a beam crane, the two pieces of steel are welded. Method for how to steel joints close together, the manufacturer will bring the frame to cover the steel. Then, it is hammered a wedge between the rectangular frame and the work piece. In the procedure, it is affected to increase time and cost. The problem is improved by construction of a prototype for steel compression with pneumatic system. It is achieved of steel joints close together quickly by pneumatic pressure. Therefore, it reduce loss of time and cost.

Keywords: Prototype/Steel Compression/Pneumatic System

[/fruitful_tab]

[fruitful_tab title=” Reducing workload amd time in studying a machine manual by translating it into Thai language”]

Abstract

The cooperative study was conducted to study the use and maintenance of the machinery used in food packaging. Researchers found problems in machine maintenance work; it is caused by technicians and machine operators. They cannot read and cannot understand operation and maintenance period because the manual is English language. Researchers have worked to translate manual into the Thai language for technicians and machine operators able to work accurately with insight into the work, better performance after read the manual that has been translated and understanding of how to use it. Numbers of survey are 10 members to conclusion. Technicians and machine operators can operate accurately and quickly, greater confidence in the operation, perform the steps correctly and safety to operate more than 90 percent. They have work understanding of more than 80 percent can be used to troubleshoot the more accurate 70 percent respectively.

Keyword: Workload / Manual / Translation
[/fruitful_tab]

[/fruitful_tabs][/vc_toggle]

[fruitful_sep]
[vc_toggle title=”2016 /2559″]
[fruitful_tabs type=”accordion” width=”100%” fit=”false”]

[fruitful_tab title=”1. Design and Calculation for Structure of Cabinet Knock Down Size. 2.3x3x2.3 m”]

Abstract

In the design of the 2.3 x 3 x 2.3 meter cabinet, the beam will be place in the same way, with a load of 500 kilograms, which will be seen as unnecessary. It was redesigned to reduce material and structure. Using finite element method for analysis. The original 2.3 x 3 x 2.3 meter cabinet design accommodates actual weight. Compared with the new design structure. based on the original size, the new beam are place. Using finite element method for analysis. It was found that the newly designed structure was capable of carrying the weight of the original structure 500 kg. using the finite element method. The newly redesigned structure can reduce material by up to 13 meters, resulting in lower production costs than traditional structures.

Keywords: structure / cabinet design / analysis / finite element
[/fruitful_tab]

[fruitful_tab title=”2. Design and Calculation for Structure of Cabinet Knock Down Size. 2.5x3x2.9 m”]

Abstract

From a design of this assembled cabinet’s structure size 2.5 x 3 x 2.9 Meter. As usual, a structure design has references from structure safety assembly size which put beams into the square shape. As a result, it make unable to know the structure that design for heavy weight support or use material unnecessary. Therefore, we think a methods in assembled Cabinet’s structural analysis size 2.5 x 3 x 2.9 meters, It designs from the existing structure and analyze to find strength for support the weight more than 1 ton. It can support for expect weight, after that we compare another structure design which referenced from the original size, but change from the original format to squares. As the result, a new design that analyzed by finite elements method. Can support weight more than 1 ton and its can be safe like an original design, but the new design structure less use conventional steels. And finally, the structure design make a new cost that more effective in producing than original design and can support heavy weight same.

Keywords : Finite Element / Structure /Cabinet / Design / Analysis / Weight
[/fruitful_tab]

[fruitful_tab title=”3. Temperature Distribution of the Transmitter Wall”]

Abstract

This report is for the study of the characteristics of the temperature of the wall of the cabinet. Between normal walls using polyurethane foam. Wall with polyurethane foam in combination with polystyrene foam, wall thickness 41 mm, consist of 3 layers with first layer, galvanized steel, thickness 0.5 mm, second layer, foam 40 mm, third layer steel Bond 0.5 millimeter. The simulation results are then used to analyze the temperature changes. By assigning external weather conditions to 40 degrees, and inserting the thermal conductivity of the materials in each layer. The temperature of the steel surface measured from the 60-degree thermometer is due to the surface being heated. Therefore, the convection of heat into the atmosphere by using the steady-state value is 5 watts per square meter. By inserting these variables into the program to help calculate the temperature distribution. The results showed that polyurethane foam can be used in combination with polystyrene foam to make the panel wall. And it has lower heat flow because of lower thermal conductivity. Therefore, the temperature distribution is lower. It makes the heat flow through the wall less than the wall using a normal wall with polyurethane foam alone. And the price of polystyrene foam is cheap. This reduces the cost of producing the transmitter wall.

Keywords: thermal conductivity / materials / temperature
[/fruitful_tab]

[fruitful_tab title=”4. The Pump Was Built From The Recycled Thing”]

Abstract

This report aims to build a waste water pump to replace the factory’s original pump for reducing the duration of pumping water out of the alcohol tank and reduce the cost of buying a pump by creating a real water pumping for testing and then do a summary. The results of the test of water pumping which made from the waste materials found that the flow rate of the pump is 42.6 liters per minute and the maximum is 7 meters with a 12 volt battery. The benefits of this study by testing the waste water pump, it can be saved the time up to 85%.On the other hand, the original water pumping can be saved the time just up to 30%. To conclude, the water pumping, which is small size, can be used more flexibly also it is made from recycled materials.

Keyword: Water Pumping/ waste Material/ Saved Time
[/fruitful_tab]

[/fruitful_tabs][/vc_toggle]