Approach to reducing wasted power in the assembly and installation work

Estimated reading time: 1 min

Project Title  :  Approach to reducing wasted power in the assembly and installation work
By                   :  Woraphong Thongmoonton, Ms.Phunyisa Kuendee
Advisor          :  Ms.Phunyisa Kuendee
Degree           :  Bachelor of Engineering
Major             :  Industrial Engineering
Faculty          :  Engineering
Semester / Academic year   :  3 /2014


Abstract

This project created to study the work. And the role of the assembly line that helps bring the signal to the receiver and the computer useful as a medium of work put into the computer signal tot discuss key aspects of information technology. In terms of functionality, accuracy and convenience in daily life. And compares with a focus on the impact of information technology. Process analysis to process data into information. To apply for benefits and suitability of use career choice Study the decision-making process in choosing the right career. A good attitude toward the occupation that creates revenue. From occupation in good faith and are socially acceptable. The importance of building a career and love working in their profession and have a good attitude towards work. Can live in adequate and happy. The process works Procedures Thinking process To their knowledge, understanding and appreciation of technology. Information technology can be applied in everyday life. Therefore, the project is interested to do the work on the assembly line and cable installations in the field to the locker exchanges tot by using the techniques and principles 7 wastes to keep working. and improve the performance of the facility.

 

Keywords:  Reduce wasted, Installation work.

 


Approach to reducing wasted power in the assembly and installation work 

Faculty of Engineering, Siam University, Thailand

Tags:
Was this article helpful? บทความนี้เป็นประโยชน์หรือไม่?
ไม่ / Dislike 0
Views: 148
Facebook
Twitter
LinkedIn
WhatsApp
Email
Print

QR code for article

QR Code