The Overall Equipment Effectiveness Improvement for Plastic Injection Molding Process in Case of the Orchid Packaging

Last modified: December 13, 2018
Estimated reading time: 1 min

IE Network Conference 2018 Research Article :  The Overall Equipment Effectiveness Improvement for Plastic Injection Molding Process in Case of the Orchid Packaging
Author                 :  Amarin Wongsetti and Joompon Bamrungwong
Email                   : amarin.wongsetti@gmail.com

Faculty                :  Department of Industrial Engineering, Faculty of Engineering, Siam University
Published            :  July 23-26, 2018


Abstract

In this case study is orchid packaging process improvement to get the maximum of effectiveness on plastic injection molding. At the current process status, the overall equipment effectiveness of the plastic injection molding process is 28.6 % which is lower than 78.6 % target from machine downtime and quality improvement. The root cause of phenomena is the hydraulic pump oil seal which is deterioration. After corrective action found that the overall equipment effectiveness of the plastic injection molding process is 82.4% and cost saving 415,200 Bath per month.

Keywords:  Overall Equipment Effectiveness, Plastic Injection Molding, Why – Why Analysis.

 


Bibliography

Amarin Wongsetti and Joompon Bamrungwong. (2018). The Overall Equipment Effectiveness Improvement for Plastic Injection Molding Process in Case of the Orchid Packaging. IE Network Conference 2018 (pp. 1092-1096). Ubonratchathani: Ubon Ratchathani University.

Link to Welcome to IE Network 2018: http://ienetwork.eng.ubu.ac.th/home/index.php/2018/06/19/hello-world/

Link to Publication:  http://ienetwork.eng.ubu.ac.th/home/wp-content/uploads/2017/10/Book-Full-Paper.pdf

The Overall Equipment Effectiveness Improvement for Plastic Injection Molding Process in Case of the Orchid Packaging

Faculty of Engineering, Industrial Engineering, Siam University, Thailand

Tags:
Was this article helpful?
Dislike 0
Views: 159