Production Capacity Increment for the Machine Spare Parts Production

Last modified: July 15, 2017
Estimated reading time: 1 min

IE Network Conference 2017Research Article :  Production Capacity Increment for the Machine Spare Parts Production
Author                 :  Amarin Wongsetti and Joompon Bamrungwong
Email                   : amarin.wongsetti@gmail.com

Faculty                :  Department of Industrial Engineering, Faculty of Engineering, Siam University
Published            :  July 12-15, 2017


Abstract

This paper focused on the optimization application for the assembly line balancing in an automotive industry. The objective is to minimize cost in front bumper production with two models in production
line. Thus, a Mathematical model has been developed to solve the line balancing problem. The computational results compare cost between single-model line balancing and mixed-model line balancing which show that mathematical mixed model given answer better than mathematical single model.

Keywords: Optimization, Line balancing, Automotive industry, Mathematical model

 


Bibliography

Amarin Wongsetti and Joompon Bamrungwong. (2017). Production Capacity Increment for the Machine Spare Parts Production. IE Network Conference 2017 (pp. 953-958). Chiang Mai: Department of Industrial Engineering, Faculty of Engineering, Chiang Mai University.

Link to Welcome to IE Network 2017: http://www.ie-network.com/index.php/document/

Link to Publication:  https://www.dropbox.com/s/ozxunxec5e7gfox/Proceeding%20Full%20Paper%20IE%20Network%202017%20%283Aug2017%29.pdf?dl=1

Production Capacity Increment for the Machine Spare Parts Production

Faculty of Engineering, Industrial Engineering, Siam University, Thailand

Tags:
Was this article helpful?
Dislike 0
Views: 71